Great opportunity to get a complete dry system at a very reasonable price.
The system was designed to dry between 150-200 tons/hour (depending on sand size). There are spare components also available. The plant was built in 2014 and was operated very successfully for several years.
The system is fully automated, coming with a metal building/lab/control room with all automated system being utilized from the control room. The company and individual who designed/installed the automation and programming of the system is still available to remove and re-install that system.
The site is fully accessible for construction removal, etc.
Equipment included with the dry plant is here: Equipment list
Contact Pete Cook ([email protected]) for more information and an intro to the seller.
Phone: 214-984-1615 | 33800 Tyler Road, Walkerton, IN 46574
• Nick Cook, Petroleum Connection
• Tim McMahon, UT Bureau of Economic Geology
• Ryan Hassler, Rystad Energy
• Joseph Triepke, Infill Thinking
• Hayden Gillespie, Black Mountain Sand
• Marcus Morton, Cyber Square
• Adam Katz, Badger Mining Corp.
• Brian McConn, Atlas Energy
• Pete Cook, Petroleum Connection [M]
• Kevin Fisher, PropX
• Bob Carter, IAC
• Chris Cloud, Saber Asset Group
• Ryan Zorn, Liberty Energy
• Sam Reynolds, Marathon Oil [M]
• Aric Christman, Encino Energy
• Charlie Crisp, Crisp Supply Chain Solutions
• Jose Sagaseta, Vorto [M]
• Matt Martinez, Texas Chrome Transport
• Sergio Sabatini, OmniTRAX
• Isaiah Martinez, WTS Energy Group
• Rick Pattillo, Lobo Logistics
• Nick Cook, Petroleum Connection
• Kirby Wilkerson, KBW Partners [M]
• Dane Walker, Wall Street Sand Company
• Dr. Anthony Konya, Konya Mining Company
• Jim Otteman, Imperium Enterprises
• William Hitters, CEO, Luxmath Consulting
• Alex Meleshko, LIUM Research [M]
• Matt Oehler, PropX
• Anna Omsberg, SandPile
• Steve Brock, Nomad Proppants
• Nick Cook, Petroleum Connection [M]
• Chris Samanns, Signal Peak Silica
• Dave Frattaroli, High Roller Sand
Event Registration – $25