Dry Sand Plant Built in 2014 Available
The facility, with or without the drying components system and loadout system, is available.
The system was designed to dry between 150-200 tons/hour (depending on sand size) and they were making 40/70, 100’s and maybe 140’s.
A good amount of additional components also available with the plant, including a building full of Rotex Screens and spare parts. The facility was built in 2014 and was very successful in their operation until things slowed down for them a few years ago. Equipment list available upon request.
The system is fully automated, it also comes with a metal building/lab/control room with all automated system being utilized from the control room.
Contact Pete Cook ([email protected] or text 540-222-2742) for an intro to the seller.
Phone: 214-984-1615 | 33800 Tyler Road, Walkerton, IN 46574
• Nick Cook, Petroleum Connection
• Tim McMahon, UT Bureau of Economic Geology
• Ryan Hassler, Rystad Energy
• Joseph Triepke, Infill Thinking
• Hayden Gillespie, Black Mountain Sand
• Marcus Morton, Cyber Square
• Adam Katz, Badger Mining Corp.
• Brian McConn, Atlas Energy
• Pete Cook, Petroleum Connection [M]
• Kevin Fisher, PropX
• Bob Carter, IAC
• Chris Cloud, Saber Asset Group
• Ryan Zorn, Liberty Energy
• Sam Reynolds, Marathon Oil [M]
• Aric Christman, Encino Energy
• Charlie Crisp, Crisp Supply Chain Solutions
• Jose Sagaseta, Vorto [M]
• Matt Martinez, Texas Chrome Transport
• Sergio Sabatini, OmniTRAX
• Isaiah Martinez, WTS Energy Group
• Rick Pattillo, Lobo Logistics
• Nick Cook, Petroleum Connection
• Kirby Wilkerson, KBW Partners [M]
• Dane Walker, Wall Street Sand Company
• Dr. Anthony Konya, Konya Mining Company
• Jim Otteman, Imperium Enterprises
• William Hitters, CEO, Luxmath Consulting
• Alex Meleshko, LIUM Research [M]
• Matt Oehler, PropX
• Anna Omsberg, SandPile
• Steve Brock, Nomad Proppants
• Nick Cook, Petroleum Connection [M]
• Chris Samanns, Signal Peak Silica
• Dave Frattaroli, High Roller Sand
Event Registration – $25