Royalty-to-Own? Creative Approach Brings Large Mine Ownership within Reach for Many
A large frac sand mine has taken a creative approach to selling their asset. They are offering, with some money down and guaranteed minimum tonnage
August 12, 2024
Unused Temporary Buildings!
Building 1 Check out this 480′ x 180′ temporary (fabric) building that has never been erected. Priced at about one third of what it would
August 12, 2024
Used Dry Plant Still Available
Dry Sand Plant Built in 2014 Available The facility, with or without the drying components system and loadout system, is available. The system was designed
August 12, 2024
Back on the Market! Two 1000-Ton Silos Available with or without the Loadout System
Previous deal fell through, so this loadout system and silos are available again! Check it out! Seller is open to selling this entire loadout
August 12, 2024